Open-ended production going well so far. Adding new formats as requested
No new caches. A few production requests ongoing, mostly tails
MC Production
Production of MC16e HITS basically done - 4.5B events
Very few samples still running. The sliced ttbar samples are now all running, in the main. Still tweaking the multiple LHE inputs stuff to get it done.
The configuration of the MC16e reco tag is converging, waiting on new release and final trigger sign off - inclusive ttbar go first, with validation in parallel (this week?)
ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
See example steps circulated by D. Qing (20100406)