Tier1 and Tier-2 Weekly Report 2018-08-28
General News
- ADC Technical Coordination Meeting
[20180827]
- BigPanDA Monitoring Updates
- Incremental Data Processing
- Fabric Monitoring via pilot wrappers (APF) integration with Harvester
- ADC Weekly Meeting
[20180828]
- Group Derivation Production
- No issues with main open-eneded requests (Main, calibration_BphysPEB, BPhysLS streams)
- Test derivation production for mc16e - many tasks finished, some are being followed up
- No new caches.
- Bulk mc16e will start in ~ 2 weeks (about a month with 150k slots)
- MC Production
- MC16e reco running 100-150k slots for last few weeks - 150M events/day, 2.76B total
- ~ 2 weeks to complete. Still need to do AOD merge, pileup steps
- Another 0.6B single top events coming
- Data17 Reprocessing
- Reprocessing of data17 physics_ZeroBias complete
- 2017 low mu data coming up (waiting on some DB updates)
- Bunch of other tasks ongoing
- CRC/ADCoS Report
- Steady ~300k slots used this week
- Recent transfer issues to SFU pointed out (restart dcache headnode)
- Increased data throughput later in the week due to derivation job brokerage for jobs with high IO intensity
- Jobs could not run at nuclei as their queues were full and not allowed to run at satellites as iolimit set to 200kBperS (increased to 400 now)
- IPv6 issue at RAL caused increase in queued requests in rucio - switch to CERN FTS until resolved
- Few other T-1 issues - resolved
- No shifters signed up for the rest of the year
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2018-08-28
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20180828
Topic revision: r1 - 2018-08-28 - LeslieGroer