Introduction

Hardware:

Worker nodes - b405-b407, b410-414, all X5650 - 6 cores, 2 GB/core, total 96 cores (effective 80 cores - see below)

Note that there is a vmem requirements for Atlas jobs in Torque:

resources_default.pvmem = 4000mb

It effectively lowers the number of usable cores to 10 per node (because we have 24 GB RAM and 16 GB swap - total 40GB)

This has always been the case for all previous jobs.

Similar to June2013 Tests

  • The cluster is ready in exactly the same configuration as we had in June of 2013. The only difference is:
    • the WNs are running SL6.4
    • Torque server (bugaboo-dev.westgrid.ca) is running SL6.4 and Torque-5.1.0 Moab-8.1.0
    • The CE configurations are unchanged since June 2013. CVMFS-2.1.20 The endpoints are mounted on the WNs using autofs

HC Configuration

Submission to test queues require the extra option use_all_spacetokens and -o[Panda]siteType=all -o[Panda]processingType=hammercloud -o[Panda]siteType=all

Tests

Test 20055342

Test 20055524

Test 20055499

Results

PD3P Benchmarks

UA Benchmarks

These cannot be compared with the Nov 2013 results as the number of jobs are different - there were many major changes during this interval (JEDI, rucio) and we don't have resources to track this down.

Topic attachments
I Attachment History Action Size DateSorted descending Who Comment
PDFpdf SFU-Arbutus.pdf r1 manage 431.1 K 2015-05-07 - 21:37 AsokaDeSilva  

This topic: AtlasCanada > WebHome > GridActivities > HammercloudTests > SFU-Apr2015
Topic revision: r19 - 2015-05-08 - AsokaDeSilva
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.