Tier1 and Tier-2 Weekly Report 2015-07-27

General News

  • ADC and ATLAS Computing News [20150727]
    • ADC Weekly meeting
    • ADC News
      • Running steadily at 200k job slots, up to 100TB/day transfered
      • Tier-0 farm not filled by grid jobs when no T0 activity - being investigated
      • Pathena still depends on DaTRI
      • Discussion ongoing about notification of lost files to physics analysis users through Rucio
      • Corrupted DB release 28.8.1 caused disruption in sim production
        • Fixed DB released assigned to jobs at time of task creation
        • Probably should be in ProdSys definition - fair amount of discussion
      • GGUS was down on Sunday - notification to GOCDB but not received by ATLAS shifters
      • Some issues with CERN EOS last wednesday (namespace mapping to PanDA resource). Patch in HC for now.
      • MC Production
        • Very stable running ~ 150k slots
          • Often exceed 20M full sim evts/day
          • 115M simul and 250M pileup processed last week
        • MC15 25ns campaign is progressing nicely
          • Some more bulk samples to finish and some large requests still coming in
        • Open Issues
          • Moving to 1kevts simul - delayed waiting on new cache
          • Tasks with low number of jobs (<10) going to finished - being discussed
          • Implementing task goals - plan to run large-scale tests this week
          • Campaign metadata - need AMI and Rucio to update campaign/bunchspacing - to be discussed
        • Due to an issue between Rucio and FTS (solved end of June)
        • Double FTS jobs causing entries in Rucio but not on disk
          • About 2M double jobs, 15k files completely lost, ~30k recoverable
      • Derivation Production
        • New cache 20.1.5.7 - in production this week. Will reprocess fraction of data only, by request
        • 25 ns cache - rebased nightlies to 20.1.6 to be in line with the reconstruction release expected to run at T0 on 25ns data
        • New DEFT train interface for MC now available to users
        • Implementation for open-ended MC production request underway - to be tested
      • Reprocessing
        • Final stages of planning - conditions essentially ready
          • Reprocess all 2015 periods A,B,C (28 runs total)
          • Config: 20.1.5.12
        • Express, CosmicCalo streams launch today
          • Use periods A,B for beam-spot. Has new LAR/ID alignment
          • period C: used to validate remaining new conditions
        • Bulk launch aimed for Aug 11 (waiting on muon alignment)
      • Tier-0 Status
        • Not much news this week
        • Ongoing investigations on slow machines in the dedicated Tier-0 batch cluster:
          • reconfiguration 32-core --> 16-core machines
          • systematic testing through HammerCloud?
        • 2 hour downtime tomorrow or Thursday - DB schema upgrade.
          • Tier-0 control and monitoring processes have to be stopped
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2015-07-21

Comments

Topic revision: r1 - 2015-07-28 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback