Reasonably often jobs fail with "lost heartbeats" - losing fractions of datasets changes the mu distribution and hence sometimes impacts any histogram sensitive to pileup.
Problems with cloning AMI tags - manual editing of new tags to fix changes not requested always required. If you miss fixing a change the production jobs often still run without problems! See ATLASAMITG-48 (may be fixed with new interface)
Need documentation for prodsys2
PRODDISK Decommissioning
Done about 85% of sites (RU, DE, FR, IT, UK, NL, ES, CA) - no T2 PRODDISK in ND
About half-way done with US (AGLT2 and MWT2 done) and 1 T2 in TW
Wait 2-3 weeks when DDM should be done with deletions, then clean up and migrate space
Have been quite full at ~130k slots for the last few days. Still have some simulation pending but only ~20M more to submit.
A very large ~500M evgen request will start in the next days - score
Very close to having ~250M FullSim request finalised. Expect ~1-2 weeks
Have new automatic approval functionality implemented in ProdSys2
Approve whole chain once the evgen is 50% done.
Should reduce delays and workload for managers.
Retry module memory change resulting in duplicated files
Derivation Production
Seeing duplicated events and discussed with Physics Coordination
Analyzers should be checking event duplications (some discussion ensued)
Re-run affected tasks and notify analyzers. Could for instance make a technical container for re-made datasets to easily notify the users
Workflow is implemented for derivations on debug stream
Submitting MC derivations as a child step to MC production: tested and ready to be opened to users, instructions will be provided tomorrow
Running longer derivation jobs: nGBPerJob=10 is now default for all derivation tasks set by production managers, nMaxFilesPerJob=100 is internally set as default in DEFT
Tier-0 report
Processing backlog (about to be) cleared
High-intensity bulk reconstruction done
High-rate calibration_PixelBeam stream recorded during ALFA run last week - about 80k jobs
Additional Tier-0 batch resources, negotiated with IT, about 10%, to be used for lower-priority (calibration) processing
Continuing work on performance and efficiency on sub-cluster
Promising new hypervisor configuration ("kilo 1") giving 20% better cpu efficiency. To be tested at Wigner
Stop of physics_MainESD production from now on
Besides saving disk space, will save I/O & serial CPU at the end of a job (modest speed-up of reco time, O(10%)?)
Spill-over development/testing in progress with a test run
Pilot Update (v63.3)
Urgent patch release, to be released asap
Number of fixes/changes to deal with spill-over jobs correctly (max size, filename convention, number of events reported when several output files created)
Correction for HC test jobs that were affected by spill-over changes
ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
See example steps circulated by D. Qing (20100406)