Tier1 and Tier-2 Weekly Report 2016-03-21

General News

  • ADC and ATLAS Computing News [20160321]
    • ADC Weekly meeting
    • MC Production
      • Grid pretty full - mostly digi+reco + sim (holding off evgen for the moment)
      • MC15c (digi+reco reprocessing)
        • Priority given to CP groups and then physics groups
        • Three variations of pileup:
          • "MC15c pileup" r7725 (a818)
          • "MC15b pileup" r7726 (a819)
          • no pileup r7728 (a820)
        • MC15c campaign started March 11
          • Issues for "MC15b pileup" case caused jobs to run too slow
          • Aborted all "MC15b pileup" tasks about mid-campaign
          • Build new AtlasProd1 cache over last weekend 20.7.5.1.1
        • Reprocessing status:
          • Most CP groups submissions started, and a few physics groups started
          • Some "MC15b pileup" resubmitted
        • digi+reco tasks doing well - up to 70M-100M/day
    • Derivations
      • Currently running validation tasks with 20.7.5.1 on m15c
        • Z->ee (mostly done) and Z->mu mu (running)
        • 93 derivations in 20 trains
        • Plan to build 20.7.5.2 next week - will be used to process mc15c MC samples
      • Validation of data processing cache (20.7.3.5)
        • Overall looks gooc, but needs precise validation
        • 62 derivations are scheduled to be part of reprocessing
        • no time-line yet
      • L1Calo
        • Submitted ZeroBias and L1Calo last week
        • 106 runs, submitted test task for CALJET, EGAMMA, PHOJET, SGLEL
        • Will submit rest once test tasks are confirmed
    • Reprocessing
    • Hammercloud AFT Updates
      • current AFTs are based on fairly old versions (rel 17)
      • Been testing new tests in AtlasDerivation 20.1.5.7
        • 729: reco_tf to run official derivation
        • 775: Athena-based: AthAnalysis 2.3.48 - NEW, under development
        • 722: Root-based: RootAnalysis 2.3.14
      • Same input dataset pattern for all templates:
        • mc15_13TeV:mc15_13TeV.*.merge.AOD.*_r6630_r6264*,
        • mc15_13TeV:mc15_13TeV.*.merge.AOD.*_r6633_r6264*
        • Already available at all sites (in hc_test.aft container)
      • Template 729 has been running since March 14: e.g. http://hammercloud.cern.ch/hc/app/atlas/test/20079875/
        • Missing tests for ANALY_IAAS_TEST
        • ANALY_SFU (eff about 85% but too few jobs for black/white list determination)
      • Plan: switch off template 508 (Athena 17.2.7.6 Reco NTUP_SMWZ) and replace it with 729 tomorrow
        • After Easter, also update the other 2 AFTs (will be announced in ADC weekly)
    • CRC/ADCoS report
      • Some dicussion about complaints in Phys Coord that users can't get their outputs
        • Could make double copies (i.e. ask rucio to make a copy in scratch somewhere else). Some concern about number of files being transferred
      • Phys Coord question about MC15c competing with other high priority tasks (e.g. HI estimated to need 2 months for reprocessing). Maybe limit the number of cores used (20k?) - may not be very effective. Have sharing as well but again may not work as expected.
      • LHC : Powering test
        • Running slots : Grid running above 200k the last week.
        • MC15c running at good speed, about 70-100 Mevts per day (pile)
        • New configuration (replacing the problematic one is under test)
        • HLT processing issues :
          • Incident with job failing 100% in some sites.
          • processingtype "urgent" moved to recon instead
        • Staging / Transfer / Deletion :
          • INFN T1 : failed transfers and low efficiency for the last 48h
          • FZK-LCG2 DATADISK: transferring errors to this site
          • Express transfers got stuck
        • FTS shares misbehaving (transient failures).
        • HI reprocessing : expected to start a few weeks.
          • The grand total is about 400M events
          • Initial checks on express stream are progressing nicely. The rate of failures is quite low
          • Hard probes test (to be done in total 250M): only 2 failed jobs out of 1k
          • Test shows that for 8-cores the memory usage is about 27-28 GB maxPSS
          • Check started to see performance with 3GB per core
        • Services :
          • pilot services went to alarm a few times
          • Few issues with Frontier squids
        • Storage:
          • Few T1s are getting full SARA-MATRIX, IN2P3-CC, BNL-OSG2
          • Deletion is needed
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2016-03-21

Comments

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2016-03-22 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback