Still no good predictor / measurement page for when grid will be emptying
Requested obsoletion and deletion of data over a week ago, but not carried through the system yet
Group Production
New cache last week (20.7.7.2) for PRW AOD
20.7.7.3 to be built this week
Tier0 has switched to 20.7.7 so production switch to 20.7.7.2 imminent
Data processing up to date. Debug done with 20.7.6.6
Deletion of O(3PB) implemented > 2 weeks ago
Plan to delete all 20.7.5.3 derivations (p2613 and p2616) next week (another 3PB)
Many lost files in last month but minimal impact on derivations. Can be rerun if necessary
Reprocessing
DATREP-59
DESDs are produced by MCP and stored at their group.
The ESDs (231.5TB) can be deleted
DATREP-60
VdM reprocessing requires huge memory, 64GB at SARA and some fraction 72GB at SiGNET
Most of 5k jobs done
DATREP-61
Lost files: Probably none need replacing, final confirmation to come today
Rel 21 validation
One last transform bug to iron out in 20.7.7.3.1
CRC/ADCoS report
Heavy-ion task using high memory >64G. HI group reviewing situation
Some issues with Kibana not reporting stats - being used by shifters
Overlay tasks generating excessive load on Frontier
Workaround to only run at BNL although Frontier meeting earlier discussed details
Oracle patch to fix issue with many stuck DB connections
Trigger reprocessing delay due to SARA TAPE downtime. DATADISK was auto-blacklisted, script now fixed. Some minor Prodsys UI issues followed-up on JIRA.
ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
See example steps circulated by D. Qing (20100406)