Tier1 and Tier-2 Weekly Report 2018-02-06

General News

  • ADC Technical Coordination Meeting [20180205]
    • Various presentations about XCache (development and testing)
  • ADC Weekly Meeting [20180206]
    • Group Derivation Production
      • November 2017 Rederivation Campaign - chasing the tails of the remaining tasks
      • sharedWriter failure rate @ 1-3% due to the metadata being too large for the buffer
      • Latest cache, AthDerivation,21.2.14.0, can't be used due to some issue with metadata
      • Possibility of merging large formats is being discussed
        • formats proposed for merging: STDM4, TOPQ1, TOPQ3 EXOT4, (JETM2), HIGG5D2
      • Discussion about reducing the maximum number of retries of a task (currently 15)
    • MC Production
      • Solid 100-150k slots for MC16d reco continued last week, continued to process 100M events a day - getting to tails
        • 3.1PB done, about 365M events waiting - done by end of week
        • Some of the INFN MCTAPE tasks restarted
      • Shifters working through request backlog - new requests coming
      • Picking up some missing MC16d
      • Last of 150M events of MC16e W+jets running to feed HPC simul. Still 100M to go
      • Improvement in monitoring: Finished state now appears in white when events genuinely lost in that step
    • Reprocessing
    • CRC/ADCoS Report
      • Stable ~320k slots (apart from power cut at CERN-P1) on Feb 5
      • Problems with EOSATLAS Wed + Thu - fixed Fri
      • Hammercloud blacklisting sites on Wed due to one missing input tarball - disabled
      • Some degradation on CERN frontiers in Kibana - caused by non-optimal tuning for large number of connections
      • Start using RAL FTS - UK+ND Jan 30, NL Jan 31
        • Large amount of transfers from UK cloud
        • Filled up local disk space due to too high logging in FTS
      • BNL - mcore merge jobs starved for input files
        • Saw large rebalance load due to CA site decommissioning (some issues with large files and slow <1MB/s transfers timing out)
        • Modified number of concurrent input/output transfers for BNL site
      • CNAF Status
        • Tape library fully functional
        • Wet tapes - hopefully recovered by Oracle end of Feb
        • Disk systems - hardware on site and installation starts tomorrow - test by end of week
        • Compute farm - service up and running. Limited by electric power and disk systems
      • Some sites been in DOWNTIME for ~ year - should be cleaned up
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2018-02-06